2008-11-03 A05: Validate links before launch

Committee: 
Web Design
Assignee(s): 
Web design team
Assignment Date: 
11/03/2008
Action Source: 
Meeting
Phase: 
Phase I
Expected Completion Date: 
12/01/2008
Percent Done: 
100%
Percent Done Date: 
03/01/2009
Actual Completion Date: 
03/01/2009

On the panel pages, we need to look at the links and validate or delete them.  (Many link to the old site, for example -- do we have equivalent content on the new site and thus should point there?)

To track this, we need a list of the pages so we can track when each was validated.  Contact Ann if you need to add to or access the list.

 