Construction work is scheduled on Oil City Road including the bridge over the Wallkill River used by the Appalachian Trail. Work will be ongoing between August 19th – September 2nd. Pedestrians are still able to cross but please exercise caution around the work area.
In:
Construction on Oil City Rd – AT Wallkill River Crossing

In:
